If the floor flange for the toilet is set in concrete the job will be a lot more difficult than if it s on the second floor for example and the flooring can be removed to permanently close off the pipe.
Capping off toilet waste pipe.
Turn off the feed valve drain the water from the tank unhook the feed line and remove the anchoring bolts with a wrench.
Push the pipe cap onto the pipe until its edge reaches the depth mark.
This will involve removing a portion of the surrounding concrete removing the floor flange which may have to be cut out and then the capping the pipe.
To permanently close off the pipe in a concrete slab the floor flange should be removed and the pipe capped below the floor surface.
Get a cleanout or expandable test plug that fits.
Measure from the end of each pipe and make a depth marking as directed by the push on fitting manufacturer.
You could also probably chip it out with a knife sharp chisel.
Capping them requires the use of a pvc cleaner and a pvc glue to hold the new cap securely.
Cap the pipes.
The mark will tell you when the fitting is pushed on all the way which is essential for a proper seal.
End cap for main drain out let.
Pull the toilet up and out of the way.
Unscrew sink lift away.
Plumbers will stock caps you will need to measure across pipe axample 100m 4 inch main pipe cap.
Remove the gasket and its remnants.
Water pipe 1pm caps.
Sink 50mm 2 inch cap.
Many of today s drainpipes are pvc.