Always follow the manufacturer s installation instructions.
Cedar roof installation guide.
At valley install a 24 wide strip of 30 roofing felt on top of cedar breather.
Cedar logs are first cut into desired lengths.
Installation for more information regarding the installation and maintenance of your cedar shake or shingle application check out the following resources.
On the left side of the page in the blue section under the heading supporting documents you will find our care maintenance brochure or click here for more information.
This document will help you with the installation of your cedar shake and shingle roofs.
Blanks or boards of proper thickness are split and then run diagonally through a bandsaw to produce two tapered shakes from each blank.
To ensure you are reading the latest edition of the roof manual please contact our office.
Handsplit red cedar shakes.
These videos will help you with the installation of your cedar shake and shingle roofs.
From roofing nails exposure spacing and keyways decking and storage to installation fastening snow brackets dormer flashing and valley flashing.
However by using a ridge vent that is pliable and at least 8 wide the material can be installed across the minimum 3 of air space at the ridge to create a shallowing of the slope at the ridge.
Cedar roof installation and roofing installation tips videos.
Cover the roof with roofing felt.
Secure it to the.
Available in premium grade 100 edge grain or number 1 grade up to 20 flat grain allowed in each bundle.
How to install a cedar shingle roof on a garden shed step 1.
Shingle installation shown when flashing a valley on a cedar roof utilizing cedar breather the flashing should be applied so that it is in direct contact with the underside of the shingle or shake interleaved felt and on top of the cedar breather and felt.
Remodeler andrew grace gives background information on types of cedar shakes and the standards and installation details outlined by the cedar shake and shingle bureau before walking through the steps to replacing a cedar roof from laying courses of self adhered membrane felt and ventilation matrix to setting up the first row of starter shingles to fitting valleys and capping hips and ridges.
Use a hammer stapler to fasten it down applying a staple every 12 to 14.